EV Charging Infrastructure in Phase 2
EV Charging Infrastructure in Phase 2 at Prestige Marigold is a decentralised smart-grid system with ultra-fast Level 3 DC charging, NACS-compatible and ISO 15118-20 V2G-ready. Residents in Bettenahalli, North Bengaluru, can charge EVs to 80% in just 20 minutes safely by 2026.
The Rise of Green Mobility in Prestige Marigold Phase 2
The EV Charging Infrastructure in Phase 2 helps homeowners save fuel and reduce carbon footprints. It uses Solar-to-EV integration, where shared solar panels provide clean power to the communal charging stations, making green travel affordable and convenient.
With high-speed fibre optics laid alongside the power lines, every charging point sends live data to your smartphone app. Residents can check real-time availability of charging stations and monitor battery health from the comfort of their homes.
EV Charging Upgrades in Phase 2
To stay ahead in 2026, we didn’t just add plugs—we built an intelligent ecosystem for the EV Charging Infrastructure in Phase 2. These advanced upgrades enhance convenience, efficiency, and safety for every resident:
- Dynamic Load Management (DLM): An AI-based system that monitors the township’s power grid and allocates additional power during off-peak hours, ensuring grid stability and efficient charging.
- Universal Charging Hubs: Supports CCS2, CHAdeMO, Type 2, and NACS connectors, making it compatible with Tesla, Tata EVs, and electric scooters.
- Smart Maintenance Sensors: Built-in thermal sensors detect overheating in cables and automatically flag maintenance needs before breakdowns occur.
- One-Tap Payments: RFID-enabled bollards and UPI integration allow residents to tap, charge, and pay instantly without hassle.
Benefits for Investors and Residents
Buying a plot with Phase 2 EV Charging Infrastructure is a forward-thinking investment. In 2026, “EV-Ready” plots are expected to have an RVI 15–18% higher than standard plots, as modern buyers prefer Plug-and-Play homes equipped for future mobility.
Phase 2 is fully V2G-ready (Vehicle-to-Grid), enabling residents to supply surplus power from their EV batteries back to the community during peak demand. This transforms vehicles into mini power stations, creating energy savings and potential revenue opportunities.
Why Prestige Marigold Leads the 2026 Market
Unlike many developers offering only basic charging sockets, Phase 2 supports next-generation solid-state battery systems. Charging hubs are strategically placed near the clubhouse and main gates to ensure smooth traffic flow and eliminate range anxiety.
With cutting-edge EV infrastructure, Bettenahalli in North Bengaluru stands out as one of the most technologically advanced residential hubs for 2026.
Technical Specifications & Safety Standards
Phase 2 follows strict 2026 safety regulations for high-voltage EV charging systems, ensuring maximum safety and performance.
- Level 3 Fast Charging: Charges electric vehicles up to 4 times faster than standard home sockets.
- IP67 Weatherproofing: Charging pedestals are protected against dust and heavy rainfall.
- Auto-Fire Suppression: Automatic fire safety systems activate instantly in case of overheating.
| Feature | Phase 2 | Home Socket |
|---|---|---|
| Charging Speed | Level 3, 80% in 20 min | 10–12 hours |
| Safety | IP67 + Auto-Fire Protection | None |
| Monitoring | Predictive Sensors | None |
Conclusion: Driving into the Future
Phase 2 EV Charging Infrastructure at Prestige Marigold is more than just a service—it helps create a cleaner, smarter future. When you buy a plot, you join a community ready for 2030, where technology works with nature, and every drive starts with clean energy.
FAQs
1. How does the EV Charging Infrastructure in Phase 2 stand out?
The Phase 2 EV Charging Infrastructure is a smart system. It is V2G-ready and can charge many vehicles at the same time without affecting the home power supply.
2. Does Phase 2 support fast charging for all electric vehicle brands?
Yes, Phase 2 charging hubs have CCS2 and Type 2 connectors. They work with Tesla, Tata, Hyundai, and Mahindra EVs. Ultra-fast DC charging can charge a car from 10% to 80% in under 20 minutes.
3. Are individual plots in Phase 2 "EV-Ready"?
Yes, every plot in Phase 2 has pre-laid underground conduits. This “Plug-and-Play” design lets owners install a personal Level 2 AC charger (up to 7.2kW) at home easily, without digging or extra approvals.
4. What are the plot dimensions in Phase 2 for building an EV-ready home?
Phase 2 has RERA-approved plot sizes for custom villas:
- 30x40 (1,200 sq. ft.) and 30x50 (1,500 sq. ft.) – Ideal for modern, smaller EV-ready homes.
- 40x60 (2,400 sq. ft.) and 50x80 (4,000 sq. ft.) – Best for bigger villas with garages that can charge multiple EVs.
5. Is Phase 2 officially cleared for immediate construction?
Yes. Phase 2 is fully BIAAPA-approved and has RERA registration PR/240122/004653. Every plot is A-Khata certified, so you can easily get home loans from leading banks to pay for your plot and solar-powered EV charging setup.